Xiamen, China · Export worldwide · FOB / CIF / DAP
Home / Manufacturing

What happens between the drawing and the container

Cutting, fit-up, welding, drilling, blasting and coating in one hall — which is why the Bailey panel, the transom and the railing post on the same project can share one welding procedure.

Steel fabrication hall with overhead gantry cranes, plate storage and a marked production bay
Fabrication hall · 10 t gantry cranes · plate and section storage under cover
Process

Six steps, each with a check before the next one starts

Production flow
StepWhat happensCheck before release
1. MaterialPlate and section cut from coil or stock to the cutting listHeat number against the mill certificate
2. CuttingCNC profile cutting, bevelling, edge preparationPart dimensions and bevel angle
3. Fit-upJig-based assembly; panels set against a master templateDiagonal, squareness, pin-hole positions
4. WeldingSAW for long seams, CO2 for stiffeners and details, to qualified WPSWeld size, visual inspection, UT or RT where specified
5. CoatingShot blast to Sa 2.5, primer or hot-dip galvanising, top coatSurface profile, DFT reading per bundle
6. PackingBundling, position marking, packing list, loading planBundle weight, mark against the drawing, photographs
Equipment

The machines that decide the tolerance

Most site problems are born in the workshop: a hole that was drilled before welding, a panel that was never trial-assembled, a plate cut on a worn machine. These are the stations that prevent it.

LIFTING

10 t overhead cranes

Long girders and bundled panels can be turned and loaded without hiring a mobile crane, which keeps the dispatch date inside our control.

WELDING

SAW plus CO2

Submerged-arc for the long straight seams on plate girders and pipe; CO2 for stiffeners, end plates, handrail nodes and repair work.

DRILLING

Drilling after fit-up

Connection holes are drilled on the assembled part, so weld shrinkage does not pull the holes out of line before the panels ever meet on site.

SURFACE

Shot blast to Sa 2.5

Blasting before primer is what makes a coating last. We record surface profile and dry film thickness, bundle by bundle.

GALVANISING

Hot-dip galvanising

For coastal and marine work, galvanising at 85 µm minimum. Small and medium items are dipped; long girders are coated with a zinc-rich system.

PACKING

Export packing

Timber bearers, steel strapping, position marks painted to match the packing list, and a loading plan drawn before the container arrives.

Welding and inspection

The paperwork that travels with the steel

A buyer cannot see the weld once it is painted. What they can see is the file that arrives with the container — and that file is what a consultant checks when the bridge is handed over.

  • Welding procedure specifications and qualification records, held for each process used
  • Welder certificates matched to the joints they actually worked on
  • Mill certificates for plate and coil, traceable to the heat number marked on the part
  • Dimensional inspection record against the approved shop drawing
  • Coating thickness record per bundle, with photographs of the loading

Third-party inspection (SGS, BV, CCIC or the client's own surveyor) can be arranged at the workshop before coating and before loading.

Welders working on steel beams inside the fabrication hall with sparks from CO2 welding
Fit-up and welding bay · CO₂ and SAW
Inside the workshop

Steel before it becomes a product

Want to see the workshop before you place the order?

Video walk-through, live call or a third-party audit — all work for us. Ask for the inspection plan at enquiry stage.

Call WhatsApp Get a quote