Xiamen, China · Export worldwide · FOB / CIF / DAP
Home / Projects

Where our steel ends up

Coastal crossings, marine working platforms and temporary bridges. Each reference is grouped by the problem the steel had to solve — and photographed on site.

Featured reference

Haicang Aoguan Avenue Bridge, Xiamen

A sea crossing in the Aoguan Bay area of Haicang District, Xiamen — road link plus a segregated walkway and cycle lane, built almost entirely over tidal water. The falsework package is the part we photographed most: piles, trusses, deck works and barrier posts.

FoundationSpiral welded piles and capping steel.
FalseworkBailey 321 / 200 trusses and ringlock.
EdgeReusable steel forms, anchor templates.
BarrierBase-plate posts and three-tube rail.
Project sheet
LocationAoguan Bay, Haicang District, Xiamen, Fujian, China
Crossing typeSea crossing with road carriageway, pedestrian and cycle lane
ExposureMarine atmosphere, tidal splash zone at the pile bents
Our scopeFalsework package: spiral welded pipe piles and capping steel, Bailey trusses, ringlock falsework, deck works and bridge guardrail
FinishHot-dip galvanised, with painted elements where specified
Key detailPile-head levels and anchor-bolt templates set to the survey line, so the trusses and barrier posts follow the deck curve
StageDeck works, ongoing

Site photography

Photographs from our own site and workshop files, October 2026. Project names describe the works; supply scope varies by package — ask us for the specific purchase order if you need a reference letter. Read the full site record →

Reference by type

The four problems we are usually asked to solve

Not every customer wants a case study — most want to know that the same details have been made before. These are the recurring types.

01 / MARINE

Sea and estuary crossings

Guardrail, edge steel and embedments for bridges built over salt water, where galvanising thickness and the base-plate detail decide the service life.

02 / TEMPORARY

Trestles and working platforms

Spiral pipe legs, capping beams and deck steel for access trestles that have to go in fast and come out without being cut apart.

03 / BAILEY

Temporary and emergency bridges

Complete 321 and 200 Bailey sets with accessories, supplied for detours, construction access and replacement of damaged crossings.

04 / FALSEWORK

Deck falsework packages

Ringlock grids for cast-in-place decks and pier caps, galvanised for marine sites, with jacks, U-heads and edge protection in the same load.

05 / PERMANENT

Welded girders to drawing

Plate girders and welded H-beams with stiffeners, splice plates, camber and drilled connections — the permanent steel that sits next to the temporary works.

06 / EXPORT

Packages for overseas contractors

Marked bundles, packing lists that match the drawing, loading plans and photographs before the container is sealed.

Need a reference for a tender submission?

Tell us the scope and the country, and we will send the relevant drawings, weights and delivery records.

Call WhatsApp Get a quote