Xiamen, China · Export worldwide · FOB / CIF / DAP
Bailey truss falsework standing on spiral welded steel pipe piles under a bridge deck over tidal water
Haicang Aoguan · falsework package

The steel that holds a sea crossing up while it is poured.

Spiral welded piles, Bailey trusses, ringlock falsework and deck steel for the Haicang Aoguan Avenue crossing in Xiamen — fabricated in Fujian and delivered to a site that sits over tidal water.

321 / 200Bailey panels & trusses
Ø219+Spiral pipe to 3,000 mm
85 µmCoastal galvanising
FOBCIF / DAP terms

Project snapshot On site

Location
Aoguan Bay, Haicang, Xiamen
Structure
Cast-in-place deck
Foundation
Spiral welded pipe piles
Falsework
Bailey trusses + ringlock
Deck edge
Steel forms, barrier posts
Exposure
Tidal water, salt air
Stage
Deck works, ongoing
Photographed on site, October 2026. Open the full record →
Built to
  • GB/T 9711
  • ASTM A252
  • API 5L
  • SY/T 5037
  • ASTM A572
  • JGJ 231
  • OSHA 1926
  • EN 12810
  • EN 1317
  • AASHTO M180
  • ISO 9001
Project spotlight

Haicang Aoguan Avenue, Xiamen

A sea crossing built almost entirely over tidal water. The photographs below are from our own site file: pile groups, Bailey trusses, ringlock along the edge, and the forms that cast the barrier plinth.

Marine foundationSpiral welded pipe piles, capping steel and bracing to drawing.
Bailey falsework321 / 200 trusses and transoms, one bill of materials per span.
Deck worksReinforcement, kerb and plinth cast on the falsework.
BarrierBase-plate posts and three-tube rail, galvanised for salt air.
From the site

What the work actually looks like

No renders and no stock photography. These are the working levels, the pile heads and the edge details that decide whether a falsework package performs.

All site photographs
Welder fitting stiffener plates on a steel beam in the fabrication hall
Fabrication hall · 10 t overhead cranes
Manufacturing

Cut, fit, weld and coat under one roof

Our workshop runs plate cutting, fit-up, submerged-arc and CO2 welding, CNC drilling and surface treatment in a single flow. That means the pile cap, the Bailey transom and the guardrail post on the same project share one welding procedure and one inspection standard.

  • WPS / PQR qualified welding, welder certificates on file
  • Dimensional check against the shop drawing before coating
  • Shot blast to Sa 2.5, then zinc-rich primer or hot-dip galvanising
  • Marking, bundle list and loading plan issued before shipment
Capability

Built for project schedules, not catalogue orders

Ask for a capacity sheet
01 / DRAWING FIRST

Shop drawings before steel

We return marked-up drawings with hole positions, splice details and camber within 3–5 working days, so the approval loop does not sit on the critical path.

02 / MIXED CONTAINERS

Four ranges, one container

Piles, panels, falsework and railing can be consolidated into a single shipment with one packing list — useful when a contractor sources the whole bridge package.

03 / COASTAL GRADE

Coating for salt air

Hot-dip galvanising to 85 µm or duplex systems for marine crossings, with coating thickness recorded per bundle and third-party checks on request.

4Ranges under one roof
10 tMax single-piece lift
3–5 dDrawing turnaround
85 µmGalvanising, coastal spec
How we work

From enquiry to unloading

Enquiry

Send the drawing, span, load class and destination port.

Quotation

Itemised price with weight, coating and packing assumptions.

Approval

Shop drawings, WPS and material certificates issued.

Fabrication

Cutting, welding, drilling, coating, dimensional check.

Shipment

Marked bundles, packing list, loading photos, B/L.

Send a drawing and get a priced, weighted, packed answer.

Tell us the span, the load class and the port. We reply with an itemised quotation and a preliminary loading plan.

Call WhatsApp Get a quote