Xiamen, China · Export worldwide · FOB / CIF / DAP
Home / Products

Bridge steel, foundation pipe and site safety — from one workshop

Four ranges that cover a crossing from the pile tip to the handrail. Each line can be ordered on its own, or consolidated into one shipment with a single packing list.

At a glance

Which range fits your scope?

Typical enquiry inputs
RangeTypical useWhat we need to quoteLead time
Spiral pipeBored / driven piles, marine trestle legs, permanent casingOD, wall thickness, length, steel grade, end detail, coating20–35 days
H-beam & BaileyTemporary road bridges, approach spans, construction accessSpan, load class, panel type, deck width, accessory list25–40 days
RinglockPier cap and deck falsework, marine platformsLayout, deck height, leg load, standard diameter20–30 days
GuardrailHighway, coastal crossing, pedestrian and cycle lanesRail type, post spacing, containment class, finish18–28 days

Lead times are indicative and start from drawing approval, not from the order date.

Not sure which range you need? Send the drawing anyway.

We will tell you what is in scope, what is not, and where the cost sits.

Call WhatsApp Get a quote